Glass is not only transparent and clean, but also has high strength and hardness. It is an indispensable material in daily production and life. There are many kinds of glass, besides float glass and tempered glass, there are also hot melt glass, glue glass, frosted glass and other kinds with special properties. 


One. How to operate the glass tiles?


If you feel incomplete, please explain the brand, that series, the operation is completely different!


First of all, it is necessary to clear the gap between the two sides of the glass brick seam.


Then fill the gap with sealant.


Then use the tool to clean one side of the seam (do not need to clear very deep, 1.5 millimeter can be, glass brick seam must be cleaned on both sides)


After that is the United States sewing agent.



Two, how to make the wall glass brick beautiful seam


2.1 Whether it is a new or an old seam, first dig out a 1 mm wide, 0.8 mm deep groove with a knife, in addition to the first time, but also for the preparation of construction tools, brush, gun, knife, sponge scraper, etc.


2.2 Sweep out the dust and particles cleaned, try to ensure that the cracks are smooth, clean and dry, so as not to affect the follow-up construction effect;


2.3 Take out the sealant, tear off the label on the buttocks, stick it on the bottle, pull open the ring, inject the sealant into the glue gun, and use the glue gun to shoot 20-50 cm of the sealant. Suggest not to shoot too long for the first time, and so on skilled in slowly lengthen, width than the gap width of 1 mm can be;


2.4 Use scraper to scrape the sealant, also can use the finger to smooth, van Tony sealant belongs to the green environmental protection product, does not contain any poisonous and harmful substances, can operate bare-handed;


2.5 Use a sponge to absorb 50% water, wipe off the sealant on both sides of the crevice, as far as possible before the sealant solidification, in order to avoid the phenomenon of indelible after solidification.


2.6 repeat 345 steps. After all horizontal lines are completed, do vertical line, follow the principle of horizontal and vertical.


2.7 24 hours later, the United States sew agent will be completely solidified, can be used normally.